Verilator Gantt report Argument settings: +verilator+prof+exec+start+2 +verilator+prof+exec+window+2 Summary: Total elapsed time = 23415 rdtsc ticks Parallelized code = 82.51% of elapsed time Total threads = 2 Total CPUs used = 2 Total mtasks = 7 Total yields = 0 Parallelized code, measured: Thread utilization = 14.22% Speedup = 0.284x Parallelized code, predicted during static scheduling: Thread utilization = 63.22% Speedup = 1.26x All code, measured: Thread utilization = 20.48% Speedup = 0.41x All code, measured, scaled by predicted speedup: Thread utilization = 56.80% Speedup = 1.14x MTask statistics: Longest mtask id = 5 Longest mtask time = 6.16% of time elapsed in parallelized code min log(p2e) = -3.681 from mtask 5 (predict 30, elapsed 1190) max log(p2e) = -2.409 from mtask 8 (predict 107, elapsed 1190) mean = -2.992 stddev = 0.459 e ^ stddev = 1.583 CPU info: Id | Time spent executing MTask | Socket | Core | Model | % of elapsed ticks / ticks | | | ====|============================|========|======|====== 10 | 20.18% / 4725 | | | 19 | 3.29% / 770 | | |